Skip to main content

Narmada waters from dam meant for irrigating parched fields; power 'last priority'

 
With the Narmada Control Authority (NCA), the powerful inter-state body working under the Government of India, having unanimously decided to raise the Narmada dam to the full reservoir level (FRL), 138.68 metres from 121.92 metres, a new apprehension is starting to grip the top Gujarat officialdom. Expressing the new fear, a senior official wondered, once the dam reaches its FRL, will the two neighbouring states, Madhya Pradesh and Maharashtra, allow Gujarat to draw as much water as it wants for irrigation – at the expense of power being produced at the dam? Of would they raise objections, as they are more interested in power than irrigating Gujarat’s parched fields?
The Gujarat government official told Counterview, “Our stand on the issue is very clear. Once the dam reaches the FRL, we would want waters to be flown into the Narmada main canal in full capacity, instead of waters going waste towards downstream through the river-bed power plant of the dam, which should ideally produce 1,200 MW of water from its six Japan-manufactured turbines. We think that there is no reason why so much of water should be allowed to flow down the Narmada river towards the sea, especially because Madhya Pradesh is on verge of fully utilising its share of Narmada water by building several irrigation projects on the river, even as producing a huge amount of power at the Indira Sagar Dam.”
Indeed, the Gujarat government has reason to worry. Only at FRL can 1,450 MW of power be produced to full capacity – 1,200 MW from the river-bed power plant, the rest, 250 MW, from the canal-head power plant. And only at the FRL can the strong force of water would make the turbines rotate to produce full capacity of power, of which Gujarat’s share, under the Narmada Water Disputes Tribunal (NWDT) award, is just 16 per cent, while Madhya Pradesh is to get 57 per cent, and Maharashtra 27 per cent. “Why should Gujarat be interested in power?”, wondered an official.
Officials confirm, till now, Gujarat was not interested in raising the dam only because it knew that by raising the dam height only the two neighbouring states will gain. As for Gujarat, enough water at the current dam height -- 121.98 metres – would be available for irrigation for an incomplete Narmada canal network. However, officials claim, with canal networking on fast track, Gujarat would need “considerably more water from the Narmada dam” than has been hitherto the case. “If water is allowed to flow down the Narmada river through the turbines, we will not get more than half the water necessary for irrigation”, one official conceded.
While Himanshu Thakkar, a well-known environmentalist on dam-related issues, believes that the issue will not arise now as it would take at least three years for the Narmada dam to reach FRL, during which time the Gujarat government will install gates, which is the last step for dam construction, a senior Gujarat official insisted, “We will have to be prepared for opposition from Madhya Pradesh and Maharashtra on this issue. Our main aim should be to keep water stored in the reservoir at FRL, which could be used in times of need, instead of allowing all of it to be drained down the river.”
Meanwhile, anti-dam Narmada Bachao Andolan leader Medha Patkar in a statement has sharply criticised Prime Minister Narendra Modi for talking about inclusive growth during his recent speech in Parliament, but actually doing just the opposite in allowing the dam’s height to be raised. “It is absolutely obnoxious that the new government has not given us any hearing, nor has it taken any time, nor made any attempt to know the ground reality, before deciding to go forward with Sardar Sarovar Dam construction to its final height.”
“Sardar Sarovar Dam at its present height itself has 2 lakh people in its affected region, so if the height is raised by installing 17 meters high gates, the densely populated villages in Nimad Madhya Pradesh with houses, farms, shops, temples, mosques, standing crops etc. will face a watery grave”, she has said, adding, “Adivasi villages in the hills in Maharashtra, Madhya Pradesh and Gujarat inhabiting hundreds of families are also to be further submerged. Altogether not less than 2.5 lakh people, farmers, fishworkers, potters, shopkeepers will face deluge and devastation, without rehabilitation, if the height is raised from 122 meters to 139 meters!”

Comments

TRENDING

A Hindu alternative to Valentine's Day? 'Shiv-Parvati was first love marriage in Universe'

The other day, I was searching on Google a quote on Maha Shivratri which I wanted to send to someone, a confirmed Shiv Bhakt, quite close to me -- with an underlying message to act positively instead of being negative. On top of the search, I chanced upon an article in, imagine!, a Nashik Corporation site which offered me something very unusual.  I don't know who owns this site, for there is nothing on it in the About Us link. It merely says, the Nashik Corporation  site   "is an educational and news website of the municipal corporation. Today, education and payment of tax are completely online." It goes on to add, "So we provide some of the latest information about Property Tax, Water Tax, Marriage Certificate, Caste Certificate, etc. So all taxpayer can get all information of their municipal in a single place.some facts about legal and financial issues that different city corporations face, but I was least interested in them."  Surely, this didn't interest...

Beyond the 'plum' posting: Why the caste lens still defines bureaucratic success

Following my recent blog on former IAS bureaucrat Atanu Chakraborty’s sudden exit as non-executive chairman of HDFC Bank, a few colleagues from the Gujarat cadre — mostly those I interacted with during my Gandhinagar stint (1997–2012) as the Times of India representative — reacted rather sharply. Most of them sent their responses directly on WhatsApp, touching upon on the merits and demerits of Chakraborty’s controversial move. One former IAS officer, a Dalit, however, went further, raising a broader question: why do some officials like Chakraborty secure plum post-retirement assignments, while others are overlooked?

Blaming RTE, not underfunding: Education groups hit back at NITI Aayog working paper

A preliminary working paper by Arvind Virmani, economist and member of the Government of India think tank NITI Aayog, has concluded that the Right to Education (RTE) Act — enacted to guarantee free and compulsory schooling for children between six and fourteen — has actually worsened learning outcomes rather than improved them. The paper, published in March 2026 and reported by The Print on 16 April, has drawn sharp pushback from education rights advocates, who argue it builds a politically motivated narrative against constitutionally guaranteed entitlements.